2 ft x 2 ft and 3 ft x 3 ft: Hopper Recovery Systems

The hopper and bucket elevator recovery systems process up to 180 cubic feet per hour of dense and coarse media, such as steel grit and shot. With the 3 ft x 3 ft hopper system, flush mounting requires a pit just 4 1/2 feet deep. Where a high water table prevents excavation, the smaller 2 ft x 2 ft system can be wall-mounted and shovel fed.

Learn More

Brochure

Find a Distributor

Have questions about Industrial Blast Facilities equipment or would like to purchase specific products? Contact the authorized Industrial Blast Facilities distributor near you to find out more.